Hard Cheese and Semi-Hard Cheese Factory in Borg Al-Arab

Project Description

The project spans an area of 43,200 m2 and includes a cheese production factory, a mosque, and a power plant. The ground floor, covering 19,130 m2, consists of a production line divided into 7 zones, a refrigerator zone with 7 refrigerators, a cheese storage room, and electromechanical services. The mezzanine floor, with an area of 3,655.5 m2, houses administrative rooms, two training halls, two operation and maintenance rooms, along with a service area including a kitchen and electrical services.

Activities

  • Architectural
  • Civil
  • Communications and security systems
  • Electrical
  • HVAC
  • Landscaping
  • Mechanical
  • Roads
  • Structural
  • Urban design

Scope

  • Detailed design
  • Construction supervision

Client

The National Company for Animal Production

LOCATION

egypt

,

project sheet

Download File (pdf 821KB)

share this project