Misr Sons Development (Hassan Allam Sons) awarded ECG the contract to provide consultancy services for Phase II of El-Gabal El-Asfar Wastewater Treatment Plant (WWTP) extension. The WWTP plant has an average capacity of 500,000m3/day and consists of secondary treatment, sludge digestion, gas recovery and power generation.
The completion of Stage II is planned to deliver an average raw sewage inflow of 1,000,000m3/day. The first phase is currently underway, and has been designed to provide treatment for an inflow of 500,000m3/day.
ECG scope covers the design development and detailed design for civil engineering structure and building works.
date
Apr 13, 2017
share