Project Description
The project’s main objective was to improve the availability, quality and sustainability of public water supply to Syrdaria region in Uzbekistan.
The project’s main components include:
Distribution network: pipes with diameter range of -50 250 mm (31 settlements).
Ground reservoir: 2,500 m3 main source of supply (12 wells, pump station with capacity of 160 m3 /hr, 60 m).
Towers: 31 towers with volume range of 250-25 m3 feeding different settlements.
Transmission pipeline: pipelines with diameter range of 600-250 mm, with length 78 km, using Micro Tunneling Technology including (pipe inside pipe system with capacity of 2000/600 mm and length of 50 m).
Activities
- Civil Works
Scope
- Construction supervision
- Detailed design
- Hydraulic Studies
- Tender documents
Client
MAILC Engineering
LOCATION
uzbekistan
,project sheet
share this project