Project Description
The project is a part of Alexandria Wastewater Program (Phase I) which was completed in 1995. Over an area of 75 hectares, the project’s site (9N) is located at 35 km west of Alexandria. The project site receives sludge cake from the Mechanical Dewatering Facility (MDF); and receives grit,
scum, and screening from the East Treatment Plant (ETP) and the West Treatment Plant (WTP).
Grit, sand and screening material generated from ETP and WTP are transported to site 9N by dump trucks.
According to 2009/2008 statistics, the total quantities transported to site 9N are 8,312 m3 / year of sludge; 7,973 m3 / year of sand; 1,749 m3 / year of screening material; and 5 3,338.8 m3 / year of industrial solid waste.
Site 9N has been initially developed as a dedicated disposal area for the sludge and land spreading area for dewatered sludge. The sludge is now being composted using tuned withdraw techniques.
The site includes six lined trenches (200 m long each) for receiving scum & screening material where the material is placed in layers; every layer is covered with clean sand.
The site also includes lined evaporation pond to receive the leached water from the trenches in addition to service facilities comprising maintenance buildings, stores, garage, administration building and laboratory.
The site is served with a lot of heavy equipment such as spreading vehicles, 300 HP trenchers, loaders, composters, dozers and water wagon.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Mechanical
- Structural
Scope
- Conceptual design
- Construction management
- Construction supervision
- Detailed design
- Geotechnical investigations
- Ground water monitoring survey
- Project management
- Schematic design
- Tender Action
- Tender documents
Client
Alexandria General Organization for Sanitary Drainage (AGOSD)
LOCATION
egypt
,alexandria
,project sheet