Renovation of Cairo Stadium, Egypt

Project Description

The project involves works of refurbishment to the following components of Cairo Stadium:

  • Horseback Riding Stadium (8,400 m2);
  • 6 service buildings (each comprising 3 floors), with a total built-up area of 3,300 m2, plus 2 floors containing locker rooms and toilets in another service building within the Indoor Halls Complex;
  • Painting of the walls and floors of Halls 2, 3 and 4 (each hall has a floor area of 1,800 m2 and total wall surface area of 3,600 m2);
  • Table Tennis Hall within the Indoor Halls Complex (520 m2);
  •  Flooring of Halls 3 and 4 (1,750 m2 per hall);
  • Audience seats of Halls 1 and 2 (20,000 seats per hall); and
  • Pentathlon Hall at Gate 2 of the Indoor Halls Complex (800 m2).

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Mechanical
  • Structural

Scope

  • Conceptual design
  • Design permits
  • Detailed design
  • Project management
  • Schematic design

Client

National of Authority for Military Production

LOCATION

egypt

,

cairo

,

project sheet

Download File (pdf 197KB)

share this project