Project Description
The project aimed at conducting the studies necessary to obtain the Leadership in Energy and Environmental Design (LEED) certification for the existing GASCO Administration Building. The building is a two-floor (ground floor + first floor) concrete structure with a floor area of approximately 3,414 m2 over a total plot area of 25,000 m2.
Completed at the end of 2009, the building started operation early in 2010. It is located inside the Ruwais Industrial Complex on the Arabian Gulf coast, approximately 230 km west of Abu Dhabi.
ECG conducted a full technical and commercial study to evaluate the potential for obtaining LEED certification and to identify the possible level of certification under LEED 2009 Operations and Maintenance (LEED O&M). ECG’s scope also included the engineering consultancy services necessary for the implementation of design and system modifications in line with LEED certification requirements.
Activities
- Architectural
- Electrical
- HVAC
- Mechanical
Scope
- Detailed technical & commercial study
- LEED assessment study
- Preparation of detailed engineering documents
- Resources conservation study
- Tender documents
Client
Abu Dhabi Gas Industries Ltd. (GASCO), UAE