Project Description
As part of Qatar’s ongoing development and to effectively meet expected potable water demand increases, Kahramaa was seeking to improve potable water services by executing various replacements, upgrading, and
extension works to some distillate and rising mains.
The Kahrmaa Headworks consultancy services were provided through three separate packages. The first package involved the use of micro-tunneling to transmit potable water from a new desalination plant to various water stations in and around Doha through an 80 km transmission pipeline with a diameter of 1,600 mm. The second package included the construction of two new concrete reservoirs with capacities ranging from 9-6 MIG
(Million Imperial Gallons), while the third package involved the construction of six new concrete reservoirs with a capacity of 6 MIG each. Packages components included pipelines with diameters ranging from 300 to 1,200 mm and lengths ranging from 20 to 70 km; a pump station; related civil works; connections to existing pipes; fiber optic cable networks (SCADA); and flow control systems.
Activities
- Architectural
- Electrical
- HVAC
- Instrumentation
- Landscaping
- Mechanical
- Piping
- Roads
- Structural
Scope
- Construction management
- Construction supervision
- Design review
Client
Kahramaa Qatar General Electricity & Water Corporation
LOCATION
qatar
,project sheet
share this project