International Hungarian University

Project Description

The University campus stretches over a total area of approximately 126,000 m2 in the New Administrative Capital of Egypt.

With a total built-up area of about 109,783 m2 and a total footprint area of approximately 20,633 m2, the campus is set to include the following buildings:
Administration Building: with a built-up area of 8,350 m2
Faculty of Architecture: with a built-up area of 7,154 m2
Faculty of Information Technology: with a built-up area of 6,769 m2
Faculty of Pharmacy: with a built-up area of 9,380 m2
• Faculty of Political Science: with a built-up area of 9,562 m2
Faculty of Arts: with a built-up area of 9,562m2
Faculty of Business Administration: with a built-up area of 9,898 m2
Faculty of Mass Communications: with a built-up area of 7,168 m2
Faculty of Engineering: with a built-up area of 15,526 m2
A library: with a built-up area of 3,300 m2​​​​​​​
• Conference halls and the auditorium: with a built-up area of 13,560 m2​​​​​​​
 Dorms: with a built-up area of 9,297 m2​​​​​​​
 Commercial facilities: with a built-up area of 1,350 m2​​​​​​​​​​​​​​
Sports area: with a built-up area of 900 m2​​​​​​​
 A clock tower: with a built-up area of 800 m2​​​​​​​
 

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • HVAC
  • Interior Design
  • Landscaping
  • Mechanical
  • Roads
  • Structural
  • Urban design

Scope

  • Acoustic studies
  • Conceptual design
  • Construction supervision
  • Design development
  • Design permits
  • Detailed design
  • Environmental impact assessment
  • Geotechnical surveys
  • Master plan
  • Schematic design
  • Tender Action
  • Tender documents
  • Topographic survey
  • Value Engineering

Client

Modern Educational Services (MES)

LOCATION

egypt

,