Infrastructure Design Works for Suluq Town (1400 Acres)

Project Description

Suluq town, situated 60 km south of Benghazi and covering 6,495,000 m2, faces significant infrastructure challenges, including issues with wastewater management, potable water supply, and road networks. To address these issues, ECG is spearheading efforts to modernize and enhance the efficiency of existing infrastructure while developing new networks. The project also includes constructing a wastewater treatment plant and lifting stations, aligning with 2025 vision outlined in the Third Generation Project for Development Potentials and Alternatives.

Activities

  • Civil
  • Communications and security systems
  • Electrical
  • Infrastructure
  • Roads

Scope

  • Conceptual design
  • Schematic design
  • Detailed design
  • Tender documents

Client

Libya Development and Reconstruction Fund (LDRF)

LOCATION

libya

,

project sheet

Download File (pdf 17KB)

share this project