Project Description
Over a land area of 16,800m2 and with a built-up area of 6,173 m2, the new training center encompasses 3 main buildings, 4 service buildings, and parking areas for 20 cars and 2 buses.
Logging & Slickline Building (2,810 m2): the ground floor includes a main entrance, second entrance, administration, logging classrooms, slickline classroom, logging workshops, logging cabins, slickline workshops, slickline cabins, slickline offices, TCP offices, TCP classroom, EUIC lab, break room, storage lockers, toilets, exit stairs, corridors and services area, while the first floor comprises classrooms, offices, break room, storage rooms, lockers, toilets, exit stairs, corridors and service
area.
Accommodation Building (748 m2): the ground floor includes 26 small suites (bed area and bathroom), IT room, electric room, administration rooms, exit stairs, corridors and waiting areas, while the first floor comprises 39 units and service area.
Recreation Building (643 m2): main entrance, secondary entrance, main lobby, lounge, main restaurant, kitchen, stairs, toilets and kitchen services.
Gate and Control Building (138 m2): guard room and a control room for site safety.
Generator and Transformer Building (166 m2): generator room, L.V. room, transformer room and a ring main unit room.
Underground Water Tank Building (56 m2): compressor room.
Radioactive Storage Building (142 m2): holes of the
radioactive unit.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Conceptual design
- Construction management
- Construction supervision
- Design development
- Detailed design
- LEED coordination
- LEED documentation
- Tender documents
Client
Halliburton Energy Services
LOCATION
egypt
,marsa-matrouh
,project sheet