Project Description
The project covers the design services of Flood Prevention Scheme (FPS-Phase3) for Doha South Areas (C2/850), including Mamoura, Abu Sidra & Al-Mearad, Old Airport & Nuaija, Ain Khalid and Al-Wakra. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works. The main components of the network are as follows: semi-perforated pipes with porous trench of diameters ranging from 300 mm to 1,000 mm, and length of approximately 50,220 m; solid pipes with diameters ranging from 400 mm to 1,200 mm, and length of approximately 12,091 m; and trench soakaway with length of approximately 250 m. The project also includes a pump station, an Emergency Flooding Area (EFA), and underground tanks.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- Instrumentation
- Mechanical
- Structural
Scope
- Detailed design
- Issued for construction
- Preliminary design
Client
HBK – Hamad Bin Khalid Contracting Co. W.L.L.
LOCATION
qatar
,project sheet
share this project