Flood Prevention Scheme For Doha North Area – Phase 3 (C1/850)

Project Description

The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works. The main components of the network are as follows: semi-perforated pipes with porous trench of diameters ranging from 300 mm to 600 mm, and length of approximately 35,350 m; solid pipes with diameters ranging from 300 mm to 800 mm, and length of approximately 32,250 m; and trench soakaway with length of approximately 4,830 m. The project also includes a pump station, an Emergency Flooding Area (EFA), and another EFA with pump station.

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • Instrumentation
  • Mechanical
  • Roads
  • Structural

Scope

  • Detailed design
  • Issued for construction
  • Preliminary design

Client

Boom Construction Company W.L.L.

LOCATION

qatar

,

project sheet

Download File (pdf 62KB)