Project Description
Misr Edfu Pulp Writing and Printing Paper Co. (MEPPCO) was inaugurated in 1963 with the aim to produce 18,000 tons/year dry unbleached pulp. SIIC assigned ECG to design the new deaerator for the plant boiler of MEPPCO at Edfu, Egypt.
ECG was assigned to conduct the studies of sizing and design of the new deaerator (4 nos.) including the interconnecting piping system between the deaerators and the boilers complete with piping arrangement drawings; pipe supports; pipe stress analysis; isometrics and the platform supporting the new deaerator.
Activities
- Industrial
Scope
- Detailed design
Client
Egyptian Sugar & Integrated Industries (SIIC)
LOCATION
egypt
,edfu
,project sheet
share this project