Project Description
The project involves the development of the original plans drafted for the two identical terminal buildings of Capital and Sphinx International airports; each terminal building comprises a ground floor (BUA 3,500 m2) and a mezzanine (BUA 750 m2).
Overall, works in each airport cover the construction of the following 30 buildings and facilities of various footprints, along with associated infrastructure and landscaping works:
- Terminal building (3,500 m2)
- Airport maintenance building (340 m2)
- Airport waste building (107 m2)
- Fire-fighting building (1,280 m2)
- Air traffic control tower (853 m2)
- Airfield lighting system building (240 m2)
- 2 Airfield lighting buildings (460 m2)
- 2 Substations (235 m2)
- Power station (220 m2)
- Administrative building (720 m2)
- Accommodation building (120 m2)
- Guardhouse (17 m2)
- Airside guardhouse (67 m2)
- Water tank (525 m2)
- Water treatment plant (2,314 m2)
- Warehouse/office building (120 m2)
- Chiller yard (350 m2)
- Meteorology building (110 m2)
- Equipment area (1,190 m2)
- Security building (40 m2)
- Weapons and ammunition depot (100 m2)
- Permissions building (106 m2)
- Meteorological hangar (7,316 m2)
- Housing facility (160 m2)
- Trained dogs facility (300 m2)
- Bathrooms building (54 m2)
- Mosque (670 m2)
- Parking area (375 m2)
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Structural
Scope
- Construction supervision
- Detailed design
- Schematic design
Client
Military Engineers
LOCATION
egypt
,cairo
,project sheet
share this project