Project Description
The project involves the development of the original plans drafted for the terminal building of Bardawil International Airport; the terminal building comprises a basement, mezzanine, and ground floor with a total built-up area of 8,000 m2.
Overall works in the airport cover the construction of 27 buildings and facilities of various built-up areas, along with associated infrastructure and landscaping works:
Terminal building (bua 8,000 m2)
• Administration building (bua 720 m2)
• Air traffic control tower (bua 1,500 m2)
• Airport maintenance building (bua 340 m2)
• Airport waste building (bua 107 m2)
• Electric substation building 1 (bua 115 m2)
• Electric substation building 2 (bua 480 m2)
• Primary airfield lighting building (bua 220 m2)
• Secondary airfield lighting building (bua 480 m2)
• Firefighting building (bua 833 m2)
• Power station building (bua 220 m2)
• Chiller yard (bua 350 m2)
• Chlorination room (bua 6 m2)
• Water tank (bua 525 m2)
• Meteorology building (bua 110 m2)
• Weapons storehouse (bua 114 m2)
• Warehouse/ office building (bua 120 m2)
• Security building (bua 40 m2)
• Guard house (bua 17 m2)
• Airside guard house (bua 134 m2)
• Permissions building (bua 106 m2)
• Housing facility (bua 634 m2)
• Soldiers’ mess (bua 316 m2)
• Bathrooms facility (bua 55 m2)
• Employees’ motel (bua 920 m2)
• Parking building (bua 375 m2)
• Mosque (bua 780 m2)
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Landscaping
- Mechanical
- Structural
Scope
- Construction supervision
- Design review
- Detailed design
- Schematic design
Client
Military Engineers
LOCATION
egypt
,sinai
,project sheet