Project Description
The fertilizer production facility, located in ElSebaaeya district of Edfu, produces single superphosphate and triple superphosphate at a combined capacity of 1,600 MT/ day. The facility resides on a 350,000 m2 plot area and is divided into two zones.
The first comprises fertilizer production and auxiliary facilities stretching over a total expanse of 207,000 m2.
The second is reserved for future production of sulfuric acid. Ideally located 500 m away from the River Nile banks, the facility is assured of a secure water supply source that is vital for its industrial/domestic uses and cost-effective operations.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Mechanical
- Piping
- Plant design
- Structural
Scope
- Conceptual design
- Construction management
- Construction supervision
- Detailed design
- FEED
- Project management