Project Description
ECG was contracted by Egyptian Federation for Construction and Building Contractors (EFCBC), to conduct the economical and feasibility study, design and tender for approximately 450 km road between Arqeen City, located at the Egyptian Sudanese Border and Donqola City, the capital of the north state, parallel to the Nile River from the west side.
This project is considered one of the main routes to connect between Egypt and Sudan with the African countries located on the same vertical route from Alexandria to Cape Town in South Africa. In spite of the fact that this study covers only the distance between Arqeen and Donqola as part of the middle route, west of the River Nile of Egypt and Sudan, its impact is also spread to cover the north and south African traffic movement throughout the COMESA agreement of the east and west Africa, and also the commercial general agreement either for services or goods.
Activities
- Roads
- Storm Drainage
Scope
- Conceptual design
- Data collection
- Economical study
- Feasibility study
- Soil investigation
- Tender documents
- Traffic impact study
Client
Egyptian Federation for Construction & Building Contractors (EFCBC)
LOCATION
sudan
,project sheet
share this project