Project Description
With a built-up area of 12,000m2, the building comprises a ground floor, two upper floors and a roof. The ground floor contains the main entrance lobby, administrative offices, classrooms, laboratories, prayer halls for men &
ladies, ablution areas, elevators, staircases, landscape courtyards, toilets, stores and services rooms. The first and second floors include administrative offices, classrooms, laboratories, elevators, staircases, toilets, stores & services rooms. The roof comprises outdoor type Air Handling Units (AHU).
The building contains two (2) open-to-sky atriums which provide natural lighting to classrooms and main staircases. A central void covered with a skylight provides natural lighting to the main entrance lobby, and two (2)
fully glazed bridges connect existing Buildings No. II & III on all floors.
The building is surrounded with a pedestrian footpath which leads to the electrical substation and the water tanks. The existing Temporary Petroleum Institute fence is extended opposite to Building No. III and a new fence is constructed surrounding the water tanks. Planted landscaped atriums are located within and between both Buildings II & III.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Mechanical
- Structural
Scope
- Basis of Design Report (BODR)
- Detailed design
- Tender documents
Client
Abu Dhabi National Oil Company "ADNOC"
LOCATION