The objective of the project is to construct a new 3-lane road (90km length and 11.7m width) connecting El Sheikh Fadl Village to Ras Ghareb City, and to upgrade the existing road as well as the median strip including the carriage way, shoulder and verge. The project encompasses circulation plan; typical U-turns; road marking & signage; pavement layers; and street lighting.
ECG’s scope involves topographic survey, geotechnical investigation, detailed design and preparation of shop drawings.
date
Apr 13, 2017
share