Automatic Fire Fighting System for Alamein Field

Aiming to protect El-Hamra Oil Field, located in Alamien; ECG will work on the engineering design for fire alarm and firefighting systems.

The Project comprises the following:

10 Storage tanks

·         1 tank; 100,000 bbl

·         4 tanks; 30,000 bbl

·         1 tank; 10,000 bbl

·         4 tanks; 9,000 bbl

Process area consist of

·         4 Oil Separators

·         1 Heater Unit

·         Power Station

·         Warehouse/Stores

·         Kitchen

·         Administration Building

·         Accommodation Buildings

·         Workshops

·         Mess Hall

·         Production facilities at; north east Alamien field (each 1000 bbl crude oil  tank).

ECG scope covers, detailed design and basis of report.