Project Description
The new plant is situated on a plot of land adjacent to the existing facilities, with a total built-up area of approximately 23,232 m2. The site includes a wide range of infrastructure and functional areas, such as: a guard house, truck scale, and dedicated zones for receiving and storing raw molasses and liquid ingredients. Core production buildings include the Yeast Cream (YC) and Instant Dry Yeast (IDY) production facilities. Additional structures comprise warehouses for finished IDY products, raw materials, and packing materials, as well as a main electrical substation, gas pressure reduction and fuel storage area, boiler house, chiller and compressed air building, water treatment plant, cooling tower, and firefighting pump station. The layout also features a main pipe rack, maintenance spare parts warehouse, administrative offices with a canteen, a laboratory, chemicals storage area, wastewater treatment plant, and a designated area for evaporation and co-products storage and unloading.
Activities
- Architectural
- Civil
- Communications and security systems
- Electrical
- HVAC
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Schematic design
- Detailed design
- Tender documents
- Cost Estimating
- Procurement
- Construction management
LOCATION
egypt
,project sheet
share this project