Egg Production Units in Wadi Al-Malak

Project Description

The project involves construction management and supervision for the establishment of two egg production units, comprising two farms spanning an area of 460,000 m2.
Each farm includes:
• An accommodation building (breeding halls)
• A disinfection and guard rooms building (breeding halls)
• A storage building (production halls)
• Main electrical rooms
• A fueling station (production halls)
• Storage and refrigeration building (production halls)
• Workshops building (production halls)
• Pump rooms
• A disinfection and guard rooms building (production halls)
• A fire tank serving both farms
• An operation and control building (production halls)
• A weapon storage building (production halls)
• A soldier accommodation building (production halls)

Activities

  • Architectural
  • Electrical
  • Mechanical
  • Structural

Scope

  • Construction supervision

Client

El Watania for Contractors

LOCATION

egypt

,

project sheet

Download File (pdf 376KB)

share this project